Join the crewMy track

Classes / Systems class / Survey Department

Survey Track: Geology, Geophysics, Mapping and Core · Rank 5 coursework · Module 1 of 3 · about 40 min

New national datums

Every coordinate depends on a datum. In the United States, NOAA's National Geodetic Survey maintains the National Spatial Reference System, which has long relied on NAD 83 for horizontal positions and NAVD 88 for heights.

NGS is replacing those with new datums tied to modern GNSS and gravity data, known as the North American Terrestrial Reference Frame of 2022 and the North American-Pacific Geopotential Datum of 2022. The change will shift published coordinates and heights, in some places by more than a meter.

For a survey team that means metadata becomes even more important. A coordinate with no datum, epoch and geoid model attached is a number without meaning, and mixing old and new frames can put a drill hole in the wrong place.

We review how a project team documents its chosen datum on deliverables and plans conversion of existing data. The responsible team sets the real project reference; an Academy rank does not grant that authority.

We separate a reference-frame name from an observation date and from official adoption. NOAA's current new-datums page still identifies NAD 83 and NAVD 88 as official while describing modernization. It describes four terrestrial frames, NATRF2022, PATRF2022, CATRF2022 and MATRF2022, tied mathematically to ITRF2020. The year in a frame's name does not mean every stored observation was collected in that year or has already been transformed.

Worked example, fictional migration review: an old coordinate file is relabeled with a new frame name while its numbers remain untouched and no transformation record exists. That changes metadata, not the coordinates' demonstrated reference. We preserve the original file and require a documented conversion approach, relevant epochs, height model and control checks before releasing a migrated deliverable. A universal constant offset is not established by NOAA's discussion of spatially varying differences.

Practice, on paper: we make a migration checklist naming the required source and destination references, evidence, reviewer and limitations. Our self-check distinguishes preparation for modernization from a claim that the new system is already official for every job. We invent no rollout date and carry no unverified frame label into a construction or drilling instruction.

Sources

Module quiz

10 questions, 8 correct to pass. You'll see what you missed and why, and you can retake it.

Next: Mapping critical minerals: Earth MRI →